TDOT is currently developing the Interstate 24 SMART Corridor Project, which takes a comprehensive approach to managing the existing infrastructure and improving travel time reliability between Rutherford and Davidson Counties.
Purpose and Need
I-24 is an integral part of the Nashville-Davidson County transportation network and a major route for commuters and freight. Since 2005, traffic volumes have increased by more than 60 percent in the Murfreesboro-Rutherford County segments of l-24. Further widening of the interstate is not financially feasible, nor will it solve the congestion issues along the corridor.
The I-24 SMART Corridor project will integrate freeway and arterial roadway elements, along with physical, technological, and operational improvements, to provide drivers accurate, real-time information and to actively manage traffic.
![i24 Logo](/sites/isis.vanderbilt.edu/files/styles/thumbnail/public/2021-09/i24-logo.png?itok=5VBYbksf)
![Nashville Skyline](/sites/isis.vanderbilt.edu/files/styles/large/public/2022-06/nashvilleskyline.jpg?itok=1oA7fvxi)